Skip to content

Project Report (Sprint 1)

Talha edited this page Nov 1, 2019 · 6 revisions

This project report briefs on the tasks completed for this sprint (Sprint 1). Details of each task can be found in their separate section, accessible through the links below.

  1. System Requirements: A list of system requirements designed for the student viewpoint.

  2. Domain Model: A domain model designed using the system requirements, which compose the tutoring system.

  3. Use Cases: Detailed use cases of how the user interacts with the system. The cases detail the identifier (A requirement which the use case covers), primary actor, secondary actor, intensions for the use case, pre-conditions (if any), main scenario, alternatives/exceptions, successes and failures.

  4. Meeting Minutes: Find all the key discussion and decisions made during the meeting of Group 16. In particular, the meeting minutes outline the meeting goals, meeting outcomes and TODOs.