-
Notifications
You must be signed in to change notification settings - Fork 0
Development Decisions
Rogiervanarkel edited this page Nov 29, 2014
·
13 revisions
During development we start to implement a basic set for the first plyable marked by 1-.
1- minimum of 3 lines
1- stations
1- reroute posibility
1- Car
- Switch
- Derailment
- Defective tram
- Woman in labour
- Angry mob
##Actions 1- Tow car
- Communications sign (for stations)
- Repair crew HTM for switch
- Crane
- Ambulance
- Police (car?)
##measurements: 1- Generaly the stations an a specific line will be visited in a regular schedual. (every # minutes) This means they can detect if a tram is to late. If so the disruption timer is set on. If all stations are cleared the disruption timer is stopped.
##Icon design: Generaly the disruption is to be seen with a action button which the player can press. If an action is chosen thi s desapears and a action timer is prsented.
- Every disruption / incident needs a represenation;
- Action button;
- Every action results in a icon with a descending timer;
- A central ascending timer.
[To do list before Christmas](To-do List before Christmas)
Design Documents
- Game Synopsis
- Design questionnaire
- Test Plan
- Test Plan First Playable
- Test Plan Beta version
- First Playable Instructions
- Disturbance Design
- [Scoring Design] (Scoring Design)
- Power-ups Design
- [Development Decisions] (Development-Decisions)
Meetings
- 2014-11-10 Macomi
- HTM traffic control information by macomi
- [Project meeting 13-14 nov] (Project meeting 13-14 nov)
Concepts
Useful