[FX-4539] Update notistack #1500
ci.yaml
on: pull_request
Build Picasso docker image
4m 12s
Integration Tests
/
Build packages
55s
Static checks
4m 15s
Deploy Picasso docs
0s
Matrix: Integration Tests / Run Integration Tests
Storybook Visual Tests
0s
Integration Tests
/
Finalize Integration Tests
0s
Annotations
6 errors
Build Picasso docker image
The operation was canceled.
|
Integration Tests / Run Integration Tests (0)
The operation was canceled.
|
Integration Tests / Run Integration Tests (1)
The operation was canceled.
|
Static checks
Canceling since a higher priority waiting request for 'CI-refs/pull/4083/merge' exists
|
Static checks
The operation was canceled.
|
Integration Tests / Run Integration Tests (2)
The operation was canceled.
|