Skip to content

Updates for rolling and removing EOL distro support (#785) #153

Updates for rolling and removing EOL distro support (#785)

Updates for rolling and removing EOL distro support (#785) #153

Triggered via push August 22, 2023 19:32
Status Failure
Total duration 2m 57s
Artifacts

main.yml

on: push
Matrix: industrial_ci
Fit to window
Zoom out
Zoom in

Annotations

10 errors
industrial_ci (rolling, main)
The job was canceled because "humble_testing" failed.
industrial_ci (rolling, main)
The operation was canceled.
industrial_ci (rolling, testing)
The job was canceled because "humble_testing" failed.
industrial_ci (rolling, testing)
The operation was canceled.
industrial_ci (humble, main)
The job was canceled because "humble_testing" failed.
industrial_ci (humble, main)
The operation was canceled.
industrial_ci (iron, main)
The job was canceled because "humble_testing" failed.
industrial_ci (iron, main)
The operation was canceled.
industrial_ci (iron, testing)
The job was canceled because "humble_testing" failed.
industrial_ci (iron, testing)
The operation was canceled.