Skip to content

fix: optimize the round trips when reconciling the subgraph deployments #2488

fix: optimize the round trips when reconciling the subgraph deployments

fix: optimize the round trips when reconciling the subgraph deployments #2488

Re-run triggered December 12, 2024 16:18
Status Cancelled
Total duration 2m 55s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (18, ubuntu-22.04)
The job was canceled because "_20_ubuntu-22_04" failed.
build (18, ubuntu-22.04)
The operation was canceled.
build (22, ubuntu-22.04)
The job was canceled because "_20_ubuntu-22_04" failed.
build (22, ubuntu-22.04)
The operation was canceled.
build (20, ubuntu-22.04)
Process completed with exit code 1.