Skip to content
Triggered via push November 18, 2024 20:45
Status Failure
Total duration 53s
Artifacts

go_test.yml

on: push
Matrix: lint and test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
lint and test (1.21): gorm_lock_test.go#L30
The copy of the 'for' variable "name" can be deleted (Go 1.22+) (copyloopvar)
lint and test (1.21): model_test.go#L27
The copy of the 'for' variable "name" can be deleted (Go 1.22+) (copyloopvar)
lint and test (1.21)
issues found
lint and test (1.22)
The job was canceled because "_1_21" failed.
lint and test (1.22): gorm_lock_test.go#L30
The copy of the 'for' variable "name" can be deleted (Go 1.22+) (copyloopvar)
lint and test (1.22): model_test.go#L27
The copy of the 'for' variable "name" can be deleted (Go 1.22+) (copyloopvar)
lint and test (1.22)
issues found
lint and test (1.20)
The job was canceled because "_1_21" failed.
lint and test (1.20): model_test.go#L39
undefined: testcontainers (typecheck)
lint and test (1.20)
issues found