Skip to content

parsed GYD and associated updates #117

parsed GYD and associated updates

parsed GYD and associated updates #117

Triggered via push July 28, 2023 05:10
Status Failure
Total duration 2m 12s
Artifacts

tox.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

17 errors
build (ubuntu-latest, 3.8)
Process completed with exit code 1.
build (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_8" failed.
build (ubuntu-latest, 3.9)
Process completed with exit code 1.
build (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_8" failed.
build (ubuntu-latest, 3.10)
Process completed with exit code 1.
build (windows-latest, 3.10)
The job was canceled because "ubuntu-latest_3_8" failed.
build (windows-latest, 3.10)
The operation was canceled.
build (windows-latest, 3.8)
The job was canceled because "ubuntu-latest_3_8" failed.
build (windows-latest, 3.8)
The operation was canceled.
build (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_8" failed.
build (macos-latest, 3.9)
The operation was canceled.
build (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_8" failed.
build (macos-latest, 3.8)
The operation was canceled.
build (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_8" failed.
build (macos-latest, 3.10)
The operation was canceled.
build (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_8" failed.
build (windows-latest, 3.9)
The operation was canceled.