Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Enable ZMQ between orchagent and syncd for smartswitch DPUs #21086

Draft
wants to merge 2 commits into
base: master
Choose a base branch
from

Merge branch 'sonic-net:master' into paravind/ss_zmq

6955820
Select commit
Loading
Failed to load commit list.
Draft

Enable ZMQ between orchagent and syncd for smartswitch DPUs #21086

Merge branch 'sonic-net:master' into paravind/ss_zmq
6955820
Select commit
Loading
Failed to load commit list.
Azure Pipelines / Azure.sonic-buildimage failed Dec 7, 2024 in 4h 17m 29s

Build #build_Azure.sonic-buildimage_merge_20241207.13 failed

Details

Tests

  • Failed: 0 (0.00%)
  • Passed: 7 (100.00%)
  • Other: 0 (0.00%)
  • Total: 7

Annotations

Check failure on line 78 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / Azure.sonic-buildimage

Build log #L78

Bash exited with code '3'.

Check failure on line 79 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / Azure.sonic-buildimage

Build log #L79

Bash exited with code '3'.

Check failure on line 155 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / Azure.sonic-buildimage

Build log #L155

Bash exited with code '3'.

Check failure on line 83 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / Azure.sonic-buildimage

Build log #L83

Bash exited with code '3'.