Skip to content

Bm/lint upgrades (#3175) #439

Bm/lint upgrades (#3175)

Bm/lint upgrades (#3175) #439

Triggered via push September 26, 2024 19:09
Status Failure
Total duration 36m 49s
Artifacts

fbgemm_ci.yml

on: push
Matrix: build-bazel
Matrix: build-linux
Matrix: build-macos
Matrix: build-windows
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 2 warnings
build-bazel (x86, linux.12xlarge, clang)
Process completed with exit code 3.
build-bazel (x86, linux.12xlarge, gcc)
Process completed with exit code 3.
build-linux (x86, linux.12xlarge, static, clang)
Process completed with exit code 8.
build-linux (x86, linux.12xlarge, shared, clang)
Process completed with exit code 8.
build-linux (x86, linux.12xlarge, static, gcc)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build-linux (x86, linux.12xlarge, static, gcc)
Process completed with exit code 137.
build-linux (x86, linux.12xlarge, shared, gcc)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build-linux (x86, linux.12xlarge, shared, gcc)
The hosted runner encountered an error while running your job. (Error Type: Disconnect).
build-linux (x86, linux.12xlarge, shared, gcc)
Process completed with exit code 137.
build-linux (x86, linux.12xlarge, static, gcc)
Received request to deprovision: The request was cancelled by the remote provider.
build-linux (x86, linux.12xlarge, shared, gcc)
Received request to deprovision: The request was cancelled by the remote provider.