Skip to content

Latest commit

 

History

History
34 lines (25 loc) · 704 Bytes

molndal_se.md

File metadata and controls

34 lines (25 loc) · 704 Bytes

Mölndal

This is a waste collection schedule integration for the Mölndal. Mölndal is using EDPEvent but does not allow for address search.

Configuration via configuration.yaml

waste_collection_schedule:
  sources:
    - name: molndal_se
      args:
        facility_id: FACILITY_ID

Configuration Variables

facility_id
(number) (required)

Examples

waste_collection_schedule:
  sources:
    - name: molndal_se
      args:
        facility_id: 105000

How to get the correct facility id

Your facility_id (Anläggning) can be found on invoices from Mölndals stad or by the Mölndals stad e-tjänst.