Skip to content

Preparing for speller release 1.0 in the GiellaLT infra #26

Preparing for speller release 1.0 in the GiellaLT infra

Preparing for speller release 1.0 in the GiellaLT infra #26

Triggered via push November 1, 2023 09:00
Status Failure
Total duration 22s
Artifacts

zulip.yml

on: push
build-and-deploy
12s
build-and-deploy
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build-and-deploy
Similar commit hashes detected: previous sha: 6cfce182af4944834c8bf32c3dcbc9d8635359dc is equivalent to the current sha: 6cfce182af4944834c8bf32c3dcbc9d8635359dc.
build-and-deploy
Please verify that both commits are valid, and increase the fetch_depth to a number higher than 50.
build-and-deploy
Process completed with exit code 1.