Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

In ELM Flrr_flood should only be accounted for when two-way land-river coupling is turned on #6301

Open
bishtgautam opened this issue Mar 19, 2024 · 0 comments
Assignees

Comments

@bishtgautam
Copy link
Contributor

Currently, the flux of flood water from MOSART (i.e. Flrr_flood) is being added even when the two-way land-river coupling is not turned on. Technically, the Flrr_flood is supposed to be 0.0_r8 for the default run (i.e. one-way land-river coupling). However, @tanzeli1982 found out that when MOSART was blowing up due to numerical instability because the MOSART time step was too large, Flrr_flood was not 0.0_r8. The fix is to only add Flrr_flood in ELM when the two-way land-river coupling is turned on.

cc: @tanzeli1982 , @liho745, @hydrotian

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Projects
None yet
Development

No branches or pull requests

1 participant